How to Price a Freelance Project
Price the complete commitment, not just the hours spent producing the final deliverable. Estimate the work, include project-specific costs, allow for identified uncertainty and write down the scope assumptions that make the fee possible.
Estimate the work around the deliverable
Break the project into discovery, planning, production, review, revisions and handover. Add project-specific admin, meetings and coordination. Use previous projects to check estimates where you can.
General business admin belongs in your rate calculation. Client-specific meetings belong in the project estimate. Keeping those separate helps avoid charging for the same allowance twice or forgetting it entirely.
List external costs and the risks you can name
List items such as subcontractors, project licences, travel or specialist research. State whether the client pays these directly or they are included in your quote. Do not add a cost again if it is already included in your baseline rate.
Identify uncertainty before choosing a contingency: incomplete inputs, several approvers, a compressed schedule or unfamiliar work. Some risks need a paid discovery stage or a narrower scope, not just a larger percentage. Avoid adding the same safety allowance both to your rate and again to the project without a reason.
A transparent starting quote
- Delivery: 20 hours. Calls and project admin: 4 hours. Included revisions: 4 hours. Total: 28 hours.
- At an illustrative selling rate of £60: 28 × £60 = £1,680.
- Add £120 in direct project costs: £1,800 subtotal.
- An illustrative 10% project contingency on that subtotal adds £180.
- Starting fixed-fee quote: £1,980, before any applicable taxes.
The £60 rate is a selling-rate assumption, not an internal cost rate. The extra 10% is included here only to demonstrate a distinct project-risk allowance. It is not a recommended percentage and should not duplicate a risk allowance already in the rate.
This formula makes the estimate explainable. The final commercial price also depends on the agreed outcome, complexity, demand and what you can credibly deliver.
Check margin without mistaking revenue for profit
For a management check, estimate the internal cost of your time and direct spending separately from the selling price. Profit is price less those costs; margin is that profit divided by price. The result depends on which costs you include.
For example, £1,500 in estimated total costs against a £2,000 fee leaves £500, or a 25% margin. Adding 25% to £1,500 instead gives £1,875 and a 20% margin. Markup and margin use different bases. These examples are planning arithmetic, not a tax or accounting calculation.
Put the price beside its scope assumptions
- Name the deliverables, formats and quantity.
- Define included review rounds and what counts as a revision.
- Record client inputs, approval responsibilities and expected dates.
- State exclusions and how additional work will be assessed and agreed.
- Clarify payment stages and the treatment of external costs and applicable taxes.
A request outside those boundaries needs a decision about time, fee and timing before it becomes accepted work. Keep a record of that decision instead of relying on memory.
The Scope Control System provides a working record for scope, change requests and their commercial impact.
Choose fixed price or hourly with the client
A fixed price gives the client a clear fee for defined work; you carry the risk of underestimated effort. Hourly pricing can accommodate evolving work, with an agreed tracking method, review points and any budget limit.
If the scope is too uncertain for either a sensible fee or time estimate, propose a defined discovery phase first. Do not hide unresolved questions inside a quote that appears more certain than it is.
Mistakes to catch before sending the quote
- Estimating only production and forgetting calls, revisions or handover.
- Using contingency as permission for unlimited changes.
- Adding profit to a rate that already includes the same profit allowance without checking the total.
- Offering a lower fee without reducing any of the commitment.
- Never comparing estimated hours with actual delivery after the project.
Work through your next quote
Use the full Pricing Calculator to work through rates, project costs and quote scenarios. If you first need a starting hourly estimate, use the free quick calculator.
Start with the Free Freelance Rate Quick Calculator →
The free tool is available through Kit email signup. Paid products are purchased on Etsy.
Continue your pricing decision
Further reading: Business.gov.au: preparing quotes. These general business principles are not jurisdiction-specific tax or legal advice.